Last week in
class we start work on out 36”inch bridge. The 36”inch bridge has a different
rule than then the first one. The 24” inch bridge only have rule on lengths,
but the 36” Inch Bridge have limited on high of the bridge. The span of the
bridge is also increasing a big amount. That made the second bridge has a lot
of different part than the first one. By using the force calculation we find
out that the 36” bridge could not be simple as make it longer. It needs a lot
of change. We are trying to work the best way thought to make a better bridge. This
week in class we are start to text our 36”bridge. The 36” bridge would be a
more advance bridge. We have learned a lot of different thing in the class. We
also get data from our test information. I am really exciting to see how does
our bridge do in the finial competition. I believe this time our bridge would improve.
This
term engineering class I really learn a lot. First I get know different type of
the bridge, Especially the truss bridge. We get know about truss bridge, and
use it in all our bridge. The first bridge is doing on the west point bridge design.
The west point bridge design give an ideally bridge. On the west point bridge design
we could test bridge and see the weight that is do on each member. That is very
helpful for future design. After the west point bridge design we start our k’net
bridge and learn how to calculate the force on each member. How to make a good serviceable
bridge in a low cost is our finial goal. In the class we use a lot of thing we
use in physic and really life to made the best bridge we can possible make.